full concrete practice on bathroom

on Thursday, 21 February 2013. Posted in Home Improvement

 

 Building the frame and drilling holes for faucet and cutting hole for sink

Two coats of Cement a scratch/bond coat and a Marble coat.



 Starting to paint. double Y














Zebra stripes

 
 

This is where it is at today. I need a little tweeking mainly to the sides and cut out lip for the sink. Then we will put on the two part epoxy.

Comments (0)

Leave a comment

You are commenting as guest.